Tesla Supercharger Benavente
A 250 kW ultra-rapid charging point on Calle Braganza in Benavente y Los Valles, Zamora, operated by Tesla (including non-tesla).
- 250 kW Ultra-rapid
- 14 minutes for 20–80%
- ± €19.80 estimated cost
- 12 sockets
Access is restricted. This point is not open to the general public — it may serve a private car park, a company fleet, or residents only. Check before making a detour.
What this means in practice
At 250 kW this is well above the 83 kW average for Zamora, which puts it among the faster options in the province.
Ultra-rapid points like this one are built for motorway stops: most drivers plug in, take a break, and leave before the battery is full, because charging slows sharply above 80%.
Only CCS is available here, so check your car takes it before relying on this point.
Where this charging point is
Loads map tiles from OpenStreetMap.
- This charging point
- Other charging points
Calle Braganza, 49600 Benavente y Los Valles · Open in OpenStreetMap · Directions
Connectors and charging time
| Connector | Power | Sockets | 20–80% |
|---|---|---|---|
| CCS | 250 kW | 12 | 14 minutes |
Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.
What a charge costs here
36 kWh × €0.55/kWh = ± €19.80
The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 14 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.
An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.
Other charging points nearby
Closest first
-
210 kW Ultra-rapid
-
22 kW Standard
-
50 kW Rapid
-
150 kW Ultra-rapid
-
11 kW Standard
-
400 kW Ultra-rapid
All charging points in Benavente y Los Valles · All of Zamora · Charging map