Volkswagen HATUSA

A 25 kW standard charging point on Carretera General La Cuesta - Taco.

  • 25 kW Standard
  • 91 minutes for 20–80%
  • ± €12.60 estimated cost
  • 2 sockets

What this means in practice

Its 25 kW is close to the 28 kW average across Santa Cruz de Tenerife.

At this speed a charge is measured in hours, not minutes, so it suits somewhere the car is parked anyway: a hotel, an office, a long shopping trip.

It carries CCS and Type 2, which covers most cars on Spanish roads.

Where this charging point is

Loads map tiles from OpenStreetMap.

  • This charging point
  • Other charging points

Carretera General La Cuesta - Taco, 38108 · Open in OpenStreetMap · Directions

Connectors and charging time

ConnectorPowerSockets20–80%
CCS 25 kW 1 91 minutes
Type 2 22 kW 1 103 minutes

Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.

What a charge costs here

36 kWh × €0.35/kWh = ± €12.60

The same charge at home would cost €5.40 (€0.15/kWh). The difference of €7.20 is what you pay for 91 minutes instead of a night on the driveway.

An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €10.71 and €14.49.

Other charging points nearby

Closest first