Repsol Los Rodeos
A 150 kW ultra-rapid charging point on Los Rodeos.
- 150 kW Ultra-rapid
- 23 minutes for 20–80%
- ± €19.80 estimated cost
- 2 sockets
What this means in practice
At 150 kW this is well above the 28 kW average for Santa Cruz de Tenerife, which puts it among the faster options in the province.
Ultra-rapid points like this one are built for motorway stops: most drivers plug in, take a break, and leave before the battery is full, because charging slows sharply above 80%.
Only CCS is available here, so check your car takes it before relying on this point.
Where this charging point is
Loads map tiles from OpenStreetMap.
- This charging point
- Other charging points
Los Rodeos, 38292 · Open in OpenStreetMap · Directions
Connectors and charging time
| Connector | Power | Sockets | 20–80% |
|---|---|---|---|
| CCS | 150 kW | 2 | 23 minutes |
Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.
What a charge costs here
36 kWh × €0.55/kWh = ± €19.80
The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 23 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.
An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.
Other charging points nearby
Closest first
-
7.4 kW Standard
-
50 kW Rapid
-
11 kW Standard
-
22 kW Standard
-
22 kW Standard
-
22 kW Standard