ITER (Instituto Tecnológico y de Enegías Renovables)

A 50 kW rapid charging point on ITER (Instituto Tecnológico y de Enegías Renovables), operated by eTecnic.

  • 50 kW Rapid
  • 60 minutes for 20–80%
  • ± €19.80 estimated cost
  • 20 sockets

What this means in practice

At 50 kW this is well above the 28 kW average for Santa Cruz de Tenerife, which puts it among the faster options in the province.

This is rapid charging — the kind you use during a meal or a supermarket run rather than overnight.

It carries Schuko (domestic socket) and CCS and Type 2, which covers most cars on Spanish roads.

Where this charging point is

Loads map tiles from OpenStreetMap.

  • This charging point
  • Other charging points

ITER (Instituto Tecnológico y de Enegías Renovables), 38612 · Open in OpenStreetMap · Directions

Connectors and charging time

ConnectorPowerSockets20–80%
Schuko (domestic socket) 3.7 kW 4 10 hours
CCS 50 kW 2 60 minutes
Type 2 22 kW 3 103 minutes
Type 2 7.4 kW 11 5 hours

Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.

What a charge costs here

36 kWh × €0.55/kWh = ± €19.80

The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 60 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.

An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.