BP Pulse POLIGONO GÜIMAR I

A 150 kW ultra-rapid charging point on Camino la Molineta, operated by Iberdrola | BP Pulse (ES).

  • 150 kW Ultra-rapid
  • 23 minutes for 20–80%
  • ± €19.80 estimated cost
  • 4 sockets

Access is restricted. This point is not open to the general public — it may serve a private car park, a company fleet, or residents only. Check before making a detour.

What this means in practice

At 150 kW this is well above the 28 kW average for Santa Cruz de Tenerife, which puts it among the faster options in the province.

Ultra-rapid points like this one are built for motorway stops: most drivers plug in, take a break, and leave before the battery is full, because charging slows sharply above 80%.

Only CCS is available here, so check your car takes it before relying on this point.

Where this charging point is

Loads map tiles from OpenStreetMap.

  • This charging point
  • Other charging points

Camino la Molineta, 38550 · Open in OpenStreetMap · Directions

Connectors and charging time

ConnectorPowerSockets20–80%
CCS 150 kW 2 23 minutes
CCS 150 kW 2 23 minutes

Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.

What a charge costs here

36 kWh × €0.55/kWh = ± €19.80

The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 23 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.

An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.

Other charging points nearby

Closest first