Repsol Barranda

A 50 kW rapid charging point on Carretera Puebla de Don Fadrique - Caravaca de la Cruz in Caravaca de la Cruz, Murcia, operated by Repsol - Ibil (ES).

  • 50 kW Rapid
  • 60 minutes for 20–80%
  • ± €19.80 estimated cost
  • 3 sockets

Access is restricted. This point is not open to the general public — it may serve a private car park, a company fleet, or residents only. Check before making a detour.

What this means in practice

Its 50 kW is close to the 44 kW average across Murcia.

This is rapid charging — the kind you use during a meal or a supermarket run rather than overnight.

It carries CCS and CHAdeMO and Type 2, which covers most cars on Spanish roads.

Where this charging point is

Loads map tiles from OpenStreetMap.

Carretera Puebla de Don Fadrique - Caravaca de la Cruz, 30410 Caravaca de la Cruz · Open in OpenStreetMap · Directions

Connectors and charging time

ConnectorPowerSockets20–80%
CCS 50 kW 1 60 minutes
CHAdeMO 50 kW 1 60 minutes
Type 2 43 kW 1 53 minutes

Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.

What a charge costs here

36 kWh × €0.55/kWh = ± €19.80

The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 60 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.

An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.