Carrefour Ciudad de la Imagen
A 22 kW standard charging point on Bar Terraza in Pozuelo de Alarcón, Madrid.
- 22 kW Standard
- 103 minutes for 20–80%
- ± €12.60 estimated cost
- 2 sockets
What this means in practice
At 22 kW this sits below the 49 kW average for Madrid — fine for a long stop, slow for a quick top-up.
At this speed a charge is measured in hours, not minutes, so it suits somewhere the car is parked anyway: a hotel, an office, a long shopping trip.
It carries Type 2 and Schuko (domestic socket), which covers most cars on Spanish roads.
Where this charging point is
Loads map tiles from OpenStreetMap.
- This charging point
- Other charging points
Bar Terraza, 28024 Pozuelo de Alarcón · Open in OpenStreetMap · Directions
Connectors and charging time
| Connector | Power | Sockets | 20–80% |
|---|---|---|---|
| Type 2 | 22 kW | 1 | 103 minutes |
| Schuko (domestic socket) | 3.7 kW | 1 | 10 hours |
Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.
What a charge costs here
36 kWh × €0.35/kWh = ± €12.60
The same charge at home would cost €5.40 (€0.15/kWh). The difference of €7.20 is what you pay for 103 minutes instead of a night on the driveway.
An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €10.71 and €14.49.
Other charging points nearby
Closest first
-
100 kW Rapid
-
150 kW Ultra-rapid
-
22 kW Standard
-
50 kW Rapid
-
22 kW Standard
-
7.4 kW Standard
All charging points in Pozuelo de Alarcón · All of Madrid · Charging map