Kia Busanauto
A 150 kW ultra-rapid charging point on Avenida de Astorga in San Andrés del Rabanedo, León, operated by EDP.
- 150 kW Ultra-rapid
- 23 minutes for 20–80%
- ± €19.80 estimated cost
- 2 sockets
Access is restricted. This point is not open to the general public — it may serve a private car park, a company fleet, or residents only. Check before making a detour.
What this means in practice
At 150 kW this is well above the 48 kW average for León, which puts it among the faster options in the province.
Ultra-rapid points like this one are built for motorway stops: most drivers plug in, take a break, and leave before the battery is full, because charging slows sharply above 80%.
Only CCS is available here, so check your car takes it before relying on this point.
Where this charging point is
Loads map tiles from OpenStreetMap.
- This charging point
- Other charging points
Avenida de Astorga, 24198 San Andrés del Rabanedo · Open in OpenStreetMap · Directions
Connectors and charging time
| Connector | Power | Sockets | 20–80% |
|---|---|---|---|
| CCS | 150 kW | 2 | 23 minutes |
Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.
What a charge costs here
36 kWh × €0.55/kWh = ± €19.80
The same charge at home would cost €5.40 (€0.15/kWh). The difference of €14.40 is what you pay for 23 minutes instead of a night on the driveway — charging here costs 3.7× the home rate, one of the widest gaps in Europe.
An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €16.83 and €22.77. Rapid charging is billed at a higher rate than standard AC charging.
Other charging points nearby
Closest first
-
50 kW Rapid
-
22 kW Standard
-
150 kW Ultra-rapid
-
50 kW Rapid
-
250 kW Ultra-rapid
-
100 kW Rapid
All charging points in San Andrés del Rabanedo · All of León · Charging map