EV charging in Arrasate / Mondragón
8 public charging locations in Arrasate / Mondragón, Gipuzkoa, of which 1 deliver 50 kW or more. The fastest runs at 60 kW.
- 8 charging points
- 1 rapid (50 kW+)
- 60 kW fastest available
All charging points
Sorted by power, fastest first
-
60 kW RapidAyunt. Mondragón
Zerrajera kalea
-
22 kW StandardBiteri etorbidea
Biteri etorbidea
-
11 kW StandardParking APK2 Biteri plaza
Biteri plaza
-
11 kW StandardRenault Autoberri
Renault Autoberri
-
7.4 kW StandardHospital San Juan de Dios
Gesalibar Auzoa
-
7.4 kW StandardLKS
Goiru Kalea
-
7.4 kW StandardMondragon Universidad
Goiru Kalea
-
7 kW StandardParking APK2 Mondragon Laubide
2 Garibai etorbidea
Who operates charging in Arrasate / Mondragón
Each operator sets its own tariff, and the same charge can cost twice as much on one network as another. Compare what each network charges.