Camping Don Cactus. Carchuna
A 3.7 kW standard charging point on Carretera del Iryda in Motril, Granada.
- 3.7 kW Standard
- 10 hours for 20–80%
- ± €12.60 estimated cost
- 2 sockets
What this means in practice
At 3.7 kW this sits below the 46 kW average for Granada — fine for a long stop, slow for a quick top-up.
This is slow AC charging, closer to a domestic socket than to a public rapid charger — useful overnight, impractical for a stop en route.
It carries Schuko (domestic socket) and CEE (industrial socket), which covers most cars on Spanish roads.
Where this charging point is
Loads map tiles from OpenStreetMap.
Carretera del Iryda, 18730 Motril · Open in OpenStreetMap · Directions
Connectors and charging time
| Connector | Power | Sockets | 20–80% |
|---|---|---|---|
| Schuko (domestic socket) | 3.7 kW | 1 | 10 hours |
| CEE (industrial socket) | 3.7 kW | 1 | 10 hours |
Charging times assume a 60 kWh battery and account for the way charging slows as the battery fills. Your car may draw less than the charger can deliver.
What a charge costs here
36 kWh × €0.35/kWh = ± €12.60
The same charge at home would cost €5.40 (€0.15/kWh). The difference of €7.20 is what you pay for 10 hours instead of a night on the driveway.
An estimate for a 20–80% charge, the range most drivers use. Real prices depend on your charging card and the operator's tariff; expect somewhere between €10.71 and €14.49.
All charging points in Motril · All of Granada · Charging map