EV charging in Carreño

2 public charging locations in Carreño, Asturias, of which 1 deliver 50 kW or more. The fastest runs at 50 kW.

  • 2 charging points
  • 1 rapid (50 kW+)
  • 50 kW fastest available

All charging points

Sorted by power, fastest first

  • 50 kW Rapid
    Avia Tebanza

    Carretera Candás-Tabaza

    2 × CCS, CHAdeMO Iberdrola | BP Pulse (ES)

  • 22 kW Standard
    Masymas Candás

    Calle La Matiella

    2 × Type 2 EDP

Who operates charging in Carreño

  • Iberdrola | BP Pulse (ES) 1
  • EDP 1

Each operator sets its own tariff, and the same charge can cost twice as much on one network as another. Compare what each network charges.

Charging nearby